Interior and Exterior Architectural Design
-Custom 2 D Floor Plans
-Custom 3 D Floor Plans
-Custom Foundations
-Custom Porches
-Custom Kitchen Sink & Bathroom Selections
-Custom Light systems and Customization of all internal and exterior aesthetics
-Custom Mechanical, Electrical and Plumbing drafted Plans
-Revision Meetings and Time Included
-Change Orders Included up to final review
-Interior Door selection
-Exterior Door selection
-Cabinetry Selections
-Appliance Selections
-Fixture Selections
-Trim and Finishes
-Utility Selections
-Custom Ceiling Selections
-Safety Systems
-Safety Rooms
-Interior Stairs
-Lofts
-Furniture and Appliance layouts
-Custom Basement
-Custom Conceptual Foundational layout
Exterior
-Roof Pitch Selection
-Gage Selection
-Custom Garage and layouts
-External Color Selections
-Collateral Load Selections
-Gutters
-Custom Decking
-Chimneys
-External Porches and Lean Toos
-Overhang Selections
-Wainscot Selection
-Ridge Cap Selection
-Water Bib Scheduling
-External GFCI Scheduling
-AC Compressor
-Lighting systems
-Security Systems
-Shutters
-External Window and Doors scheduling
-Driveways
-Basic Landscape
-International Building Code and International Building Code Research
-Elevations
-Roof Pitch
-Stamped and Sealed for permitting and construction
-Structural Cold Form Steel Building
-Door and Window Scheduling
-Steel Design
-Building Prep for Structural Engineers
-Code Compliance for IBC and IRC code in regards to steel building compliance
-Collateral Loads research for EOR
-Building Department, Zoning Department and EPA office Research
In House Engineering of Record
-Oversight, Review of Senior Engineer
-Stamped and Sealed Architectural Plans
-Stamped and Sealed Mechanical, Electrical and Plumbing Plans
-RES (Resistive Load Ampacity) Stamped and Sealed
-Special Engineering Included for basements or other request
- Structural Engineer on Record for Steel Building
-Stamped wood structures are reviewed and stamped by our Engineers on Record for residential and commercial projects
-Cold Form Steel Buildings or Red Iron Buildings will come with a secondary set of plans from the manufacturer as a EOR for risk category in regards to intent of the build.